D1 Training Center for HL Contractors

Brandon, FL

Commercial

D1 Fitness Centers

Complete plumbing installation for new commercial fitness facility construction in partnership with HL Contractors.

Challenge

D1 Fitness Centers required comprehensive plumbing for a new ground-up fitness facility including multiple locker rooms, restrooms, drinking fountains, and complex mechanical systems. The project required precise coordination with the general contractor and other trades, adherence to tight construction schedules, and commercial-grade installations throughout.

APS Approach

We worked closely with HL Contractors from the planning phase through final completion, providing complete rough-in and trim plumbing services. Our team coordinated water supply, waste, and vent systems for the entire facility, including specialized fixtures for commercial fitness use. We maintained consistent communication with the project team and stayed on schedule throughout all phases of construction.

Outcome

Delivered a fully functional commercial plumbing system that met all code requirements and project specifications. The facility opened on schedule with all plumbing systems operating properly. Our work contributed to the successful completion of a modern fitness facility serving the local community.

Entire Builders Inc.

St. Augustine, FL

New Construction

Custom Home – Entire Builders

Ground-up plumbing for high-end custom home with complex systems, multiple bathrooms, and premium fixtures.

Challenge

This custom home project required complete plumbing from underground rough-ins through final fixture installation. The home featured multiple full bathrooms, a gourmet kitchen, outdoor kitchen area, and high-end plumbing fixtures throughout. The builder needed a plumbing contractor who could work from architectural plans, coordinate with other trades, and deliver quality work that matched the premium standards of the home.

APS Approach

We handled all plumbing phases: underground rough-ins before the slab, in-wall rough plumbing during framing, testing and inspection preparation, and final trim and fixture installation. Our team worked from detailed architectural plans and coordinated closely with Entire Builders throughout the construction process. We provided solutions for complex fixture installations and ensured all systems were properly sized and installed for optimal performance.

Outcome

Delivered complete, code-compliant plumbing that met the high standards expected for a custom home. All systems passed inspection without issues, and the homeowners received a beautifully finished home with reliable, well-designed plumbing throughout. The builder was satisfied with our coordination, quality of work, and professional execution.

St. Vincent de Paul

St. Augustine, FL

Emergency

Emergency Service – St. Vincent de Paul

Rapid response and repair for critical plumbing failure at essential nonprofit facility serving the community.

Challenge

St. Vincent de Paul experienced a serious plumbing failure that threatened to shut down operations at their facility, which provides critical services to vulnerable community members. The situation required immediate response, quick diagnosis, and efficient repair to minimize downtime. The facility could not afford extended closure, making speed and reliability essential.

APS Approach

Our team responded immediately upon receiving the call. We quickly assessed the situation, identified the problem, and implemented an effective repair solution. We worked efficiently to restore full plumbing functionality while minimizing disruption to the organization's important work. Our focus was on providing a lasting fix rather than a temporary patch.

Outcome

Successfully resolved the plumbing emergency and restored the facility to full operation with minimal downtime. St. Vincent de Paul was able to continue serving the community without significant interruption. The organization appreciated our rapid response, professional service, and commitment to helping them maintain their essential operations.

Residential

Full Remodel – Cincinnati Ave

Complete plumbing redesign and installation for comprehensive historic home renovation.

Challenge

This historic home on Cincinnati Avenue underwent a complete renovation requiring full plumbing redesign and installation. The existing plumbing was outdated and inadequate for modern use. The project required removing old systems, designing new plumbing layouts to match the renovation plans, and installing all new plumbing while preserving the home's historic character.

APS Approach

We worked closely with the renovation team to plan new plumbing layouts that met modern standards while respecting the home's architecture. Our team removed outdated plumbing systems and installed completely new water supply, waste, and vent systems throughout the home. We coordinated our work with other contractors and addressed challenges typical of working in older homes, such as unforeseen conditions and structural considerations.

Outcome

Delivered a complete, modern plumbing system in a beautifully renovated historic home. The new plumbing provides reliable performance and efficiency while maintaining the home's character. The homeowners now enjoy modern plumbing convenience in their renovated home, and all work met current code requirements despite the challenges of historic renovation.

Repipe

Whole-Home Repipe – Hawthorne Drive / Shores

Complete copper-to-PEX water supply line replacement for occupied home with minimal disruption.

Challenge

The home on Hawthorne Drive had aging copper water supply lines causing recurring leaks and water quality concerns. The homeowners needed a complete repipe but were living in the home and required the work to be completed with minimal disruption to their daily lives. The project required accessing pipes throughout the house—behind walls, in ceilings, and in crawl spaces—while maintaining livable conditions.

APS Approach

We carefully planned the repipe to work efficiently while minimizing impact on the homeowners. Our experienced team systematically replaced all water supply lines with modern PEX piping, which offers superior reliability and longevity. We accessed pipes strategically to minimize wall and ceiling work, protected the home throughout the process, and maintained water service as much as possible. We completed the work in phases to reduce disruption.

Outcome

Successfully completed a full home repipe while the homeowners remained in the house. The home now has a completely new, reliable water supply system using modern PEX piping that will provide decades of trouble-free service. The homeowners were pleased with our professionalism, cleanliness, and effort to minimize disruption during the project.

Alpha Omega Miracle Home

St. Augustine, FL

Commercial

Alpha Omega Women's Shelter

Plumbing upgrades and repairs for essential community service facility supporting vulnerable populations.

Challenge

Alpha Omega Women's Shelter needed plumbing upgrades and repairs to maintain their facility serving women and families in need. As a nonprofit providing critical services, they required reliable plumbing work completed professionally and efficiently. The facility needed to remain operational throughout the work, and budget considerations were important.

APS Approach

We assessed the facility's plumbing needs and provided clear recommendations and fair pricing. Our team completed necessary upgrades and repairs efficiently and professionally, working around the shelter's operations to minimize any disruption. We understood the importance of the organization's mission and treated the project with the care and respect it deserved.

Outcome

Delivered reliable plumbing improvements that support the shelter's ongoing operations. The facility now has upgraded, functional plumbing systems that will serve the organization well as they continue their important community work. We were honored to contribute our skills to supporting an organization that serves vulnerable community members.

Rebuild Florida

Throughout Florida

Emergency

Rebuild Florida – Hurricane Recovery

Post-hurricane plumbing restoration work helping families recover and rebuild after storm damage.

Challenge

Following hurricane damage, numerous Florida families faced destroyed or severely damaged plumbing systems in their homes. As part of the Rebuild Florida program, these families needed reliable plumbing contractors to restore their homes to safe, livable condition. The work required assessing storm damage, removing damaged plumbing, and installing new systems to help families get back into their homes.

APS Approach

We participated in the Rebuild Florida recovery effort, bringing our experience and capabilities to help families rebuild. Our team assessed hurricane damage to plumbing systems, removed damaged components, and installed new plumbing to restore homes to functional condition. We worked efficiently to help families return to normal life as quickly as possible while ensuring quality, code-compliant installations.

Outcome

Successfully helped multiple families restore their homes following hurricane damage. Our plumbing work contributed to families being able to return to safe, functional homes after devastating storm impacts. We were proud to use our skills and experience to help our community recover and rebuild after natural disaster.

Have a Project in Mind?